← Back to blog
Case Study
Hurricane-Resilient Construction in 2026
2026-02-18
Working with the project's structural engineers, our team specified a panel-and-steel assembly tested to ASTM E1996 missile impact and ASCE 7 wind loads. The contractor's framing crew set the panels per our stamped layout drawings…